ADU Builder & Contractor in Aliso Viejo, CA

From Property Evaluation and ADU Design to Engineering, Permits, Utility Planning & Complete Construction—We Manage Your ADU Project From Start to Finish.

 

Licensed • Insured • Bonded • 15+ Years Experience • Design-Build Experts • Serving Southern California

Start Your Project

Aliso Viejo ADU Construction, From Property Evaluation and Design to Permits and the Final Build

Adding an ADU in Aliso Viejo starts with determining what your property can realistically accommodate.

Is there enough usable yard area for a detached ADU? Would an attached unit make better use of the lot? Is there an existing garage or part of the home that could be converted? Where will the new unit connect to utilities, and what will the project require for access, setbacks, grading, and construction?

Kol & Co. provides full-service ADU construction in Aliso Viejo, including property evaluation, design, engineering, permitting, site work, utilities, construction, kitchens, bathrooms, finishes, inspections, and final completion.

We are a licensed, insured, and bonded design-build contractor with 15+ years of experience, giving homeowners one team to coordinate the project from the initial feasibility questions through the finished living space.

We serve Glenwood, Westridge, Pacific Ridge, California Summit, Canyon Vistas, Talavera, and surrounding Aliso Viejo communities.

Schedule Your In-Home Consultation Today!

How Much Does It Cost to Build an ADU in Aliso Viejo?

A realistic planning range for the complete ADU projects we typically build is: 

$200,000–$500,000+

The budget depends on much more than the ADU’s square footage. 

Important cost factors include ADU type, site access, grading, foundation conditions, utility connections, structural requirements, kitchen and bathroom specifications, windows and doors, and the overall level of finish.

What Goes Into Building an ADU?

An ADU may be smaller than the primary home, but it still contains most of the same major building systems.

Site, Foundation & Structure

For new construction, the work can include:

  • Site preparation
  • Excavation and grading
  • Foundation
  • Structural framing
  • Roofing
  • Exterior walls
  • Windows and doors
  • Insulation
  • Exterior finishes

Site conditions can have a significant impact here. Building on a straightforward, accessible area is different from building where additional grading, drainage, or difficult access needs to be addressed.

 

 

Learn More

Utilities & Building Systems

A completed ADU needs the systems required to function independently as a residence.

Depending on the project, we coordinate:

  • Water
  • Sewer
  • Electrical
  • Plumbing
  • HVAC
  • Water heating
  • Kitchen connections
  • Bathroom plumbing
  • Laundry connections
  • Ventilation

The location and capacity of existing utilities should be evaluated early because they can influence both the ADU location and construction cost.

Learn More

Kitchen, Bathroom & Interior

Inside the ADU, we can coordinate:

  • Kitchen cabinetry
  • Countertops
  • Appliances
  • Bathroom
  • Shower or tub
  • Plumbing fixtures
  • Flooring
  • Lighting
  • Interior doors
  • Storage
  • Laundry
  • Closets
  • Painting and finishes

With a smaller floor plan, details such as cabinet depth, door swings, storage, furniture placement, and circulation become especially important.

Learn More

Exterior & Site Completion

Depending on the project, exterior work may include:

  • Walkways
  • Exterior lighting
  • Drainage
  • Landscaping repairs
  • Utility trench restoration
  • Fencing or gates
  • Final grading
  • Site cleanup

The finished ADU should work with the rest of the property—not feel like a building that was simply fitted into the remaining yard.

 

 

 

 

Learn More

What Are the ADU Requirements in Aliso Viejo?

The exact requirements depend on the property and ADU type, but key Aliso Viejo standards include:

  • ADU size: Generally up to 850 sq. ft. for a studio or one-bedroom ADU and 1,000 sq. ft. for an ADU with two or more bedrooms under the City’s locally regulated standards
  • JADU size: Maximum 500 sq. ft.
  • Side setback: Generally 4 feet
  • Rear setback: Generally 4 feet
  • Detached ADU height: Generally 16 feet, with additional height allowed in certain situations
  • Attached ADU height: Up to 25 feet or the primary dwelling’s applicable zoning height limit, whichever is lower, and no more than two stories under this provision
  • Parking: Generally one space per ADU or bedroom, whichever is less, but several exemptions apply—including qualifying ADUs within ½-mile walking distance of public transit and certain conversions
  • Fire sprinklers: Required in the ADU if sprinklers would have been required for the primary residence when it was constructed; building an ADU alone does not trigger sprinklers for the existing home
  • Short-term rentals: ADUs and JADUs cannot be rented for periods of less than 30 days
  • Permits: ADUs require applicable City review and building permits

Because several standards change based on ADU type, existing structures, lot conditions, and the applicable approval pathway, we verify the allowable size, setbacks, height, parking, and building requirements for the individual property before developing the plans.

How Long Does an ADU Take in Aliso Viejo?

For the full project, homeowners should generally plan for approximately:

12 Months

That includes:

Property Evaluation → Design → Engineering → Permitting → Pre-Construction → Construction → Inspections → Completion

The actual timeline depends on the design, City review, engineering, site conditions, utilities, material lead times, and complexity of construction.

The City’s permit-review timeline is only one part of the overall schedule. Planning, engineering, corrections, pre-construction, and the actual build all need to be accounted for.

Do You Need a Permit to Build an ADU in Aliso Viejo?

Yes.

Aliso Viejo’s current ADU regulations provide different approval pathways depending on the type of ADU being proposed.

Depending on the project, permit documents can include:

Site plan
Floor plans
Building elevations
Structural plans
Structural calculations
Energy documentation
Utility information
Project-specific construction details
Other required supporting documents

Kol & Co. coordinates the applicable design, engineering, permit documentation, construction, required inspections, and final completion.

Our Design-Build Approach

step 1

Property & Feasibility Review

We start by evaluating the Aliso Viejo property, including the existing home, lot configuration, possible ADU location, access, utilities, and the type of unit you're considering.

step 2

Design & Planning

We develop the ADU around the property and intended use, including the floor plan, kitchen, bathroom, bedrooms, storage, windows, doors, exterior design, and other project details.

step 3

Engineering & Permits

We coordinate the applicable structural engineering, energy documentation, plans, City submittal, corrections, and permit process.

step 4

Construction

Once approved, we coordinate the applicable site work, foundation, framing, roofing, plumbing, electrical, HVAC, insulation, drywall, cabinetry, countertops, tile, flooring, fixtures, finishes, and required inspections.

step 5

Final Completion

After construction and applicable final inspections, we complete the remaining details and final walkthrough.

Featured Projects in Aliso Viejo

Why Clients Choose Us?

Get inspired by the experiences shared by those we’ve worked with.

Areas We Serve

We work with homeowners throughout Aliso Viejo, including Glenwood, Westridge, Pacific Ridge, California Summit, Canyon Vistas, Talavera, and surrounding communities.

Start Your ADU Project in Aliso Viejo

A successful ADU starts with understanding the property—where the unit can fit, how large it can be, how utilities will reach it, and what will be required to get it approved and built.

Kol & Co. coordinats your Aliso Viejo ADU from property evaluation and design through engineering, permitting, construction, inspections, and final completion.

Schedule Your In-Home Consultation Today!

Frequently Asked Questions

Can I build an ADU on my Aliso Viejo property?

Many residential properties can accommodate an ADU. The appropriate size, type, and location depend on the existing home, lot configuration, setbacks, site conditions, and applicable City standards.

Under Aliso Viejo’s locally regulated standards, an ADU can generally be up to 850 sq. ft. for a studio or one-bedroom unit and 1,000 sq. ft. for a unit with two or more bedrooms. Separate state-law ADU provisions can apply to certain projects.

Do not assume that 1,200 square feet is available simply because that number appears in general California ADU information.

Aliso Viejo’s current locally regulated standards generally establish 850 sq. ft. for a studio or one-bedroom ADU and 1,000 sq. ft. for an ADU with two or more bedrooms. Other state-law pathways have their own standards, so the allowable size should be confirmed for the specific property and ADU type.

A practical planning range for the complete ADU projects we typically take on is approximately $200,000–$500,000+, depending on the ADU type, site conditions, utilities, structural work, size, and finishes.

Yes. We can coordinate the applicable design, engineering, permits, construction, inspections, and final completion.