Custom bathroom renovations for Pacific Palisades homes—from complete primary suites and walk-in showers to custom vanities, natural stone, plumbing, lighting, waterproofing, and full construction.
Licensed • Insured • Bonded • 15+ Years Experience • Design-Build Experts • Serving Southern California
A bathroom renovation in Pacific Palisades is often part of a bigger investment in the home. Some homeowners are updating an existing residence with a larger primary bathroom, better layout, custom cabinetry, and higher-quality finishes. Others are remodeling multiple rooms at once or rebuilding and redesigning their home following the Palisades Fire.
Kol & Co. provides luxury bathroom remodeling in Pacific Palisades, from complete primary bathroom renovations to guest bathrooms and bathrooms incorporated into full-home remodels and rebuilds.
We coordinate the details that matter both visually and behind the walls—layout, plumbing, electrical, waterproofing, ventilation, custom vanities, tile and stone, fixtures, lighting, permits when required, and construction.
With more than 15 years of construction experience, we can also handle the bathroom with the larger architectural and construction scope when it’s part of a complete home renovation or rebuild.
Not every bathroom project begins with an existing room that simply needs updating.
For homeowners undertaking a major renovation or rebuilding after the Palisades Fire, we can design and build bathrooms as part of the larger home—allowing the layout, plumbing, cabinetry, materials, lighting, and finishes to be planned together rather than addressed as separate remodeling projects.
This is particularly valuable when you’re planning:
Kol & Co. can handle these spaces as part of the broader design, engineering, permitting, and construction process.
Complete primary bathroom renovations with redesigned layouts, custom showers, freestanding tubs, custom vanities, stone and tile, lighting, plumbing, and carefully coordinated finishes.
Complete guest bathroom renovations designed to feel consistent with the architecture and finish level of the rest of the home, including new showers or tubs, vanities, tile, lighting, fixtures, and storage.
Custom shower construction with options such as curbless entries, frameless glass, benches, niches, linear drains, multiple shower fixtures, natural stone, and large-format tile.
Made-to-fit cabinetry planned around the bathroom layout, with options for double vanities, floating cabinetry, integrated storage, makeup areas, stone countertops, and custom hardware.
Bathroom design and construction coordinated as part of a larger Pacific Palisades renovation or rebuild, including multiple bathrooms, new primary suites, plumbing changes, and whole-home finish coordination.
A complete bathroom renovation involves much more than replacing tile and fixtures. We coordinate the construction behind the finished space as well as the details you’ll see every day.
We remove the existing bathroom and prepare the space for the new layout, including framing or structural modifications when the design requires them.
What's included:
The systems behind the walls are coordinated with the new shower, vanity, tub, lighting, outlets, and ventilation.
What's included:
Proper preparation is especially important in wet areas. We build the shower and prepare bathroom surfaces before the finished tile goes in.
What's included:
Once the major construction is complete, we install the cabinetry, fixtures, glass, hardware, and other visible finishes.
What's included:
Learn More
A bathroom remodel with Kol & Co. typically falls around $25,000–$40,000+, depending on the bathroom size, existing conditions, layout changes, plumbing and electrical work, materials, and level of customization.
Larger primary bathrooms and projects involving extensive layout changes, custom cabinetry, premium stone, specialty fixtures, or significant plumbing work can exceed this range.
Some of the biggest cost factors include:
Bathroom size
Moving plumbing
Shower or tub configuration
Custom vanity and cabinetry
Tile and stone selections
Electrical and lighting changes
Heated flooring
Structural or layout changes
Existing conditions discovered during demolition
The best estimate comes from understanding what is staying, what is moving, and what needs to be rebuilt.
Most of our bathroom remodels take approximately 3–5 weeks of construction once the project is ready to begin.
A straightforward bathroom where the main layout remains similar may move faster than a larger primary bathroom involving plumbing relocation, custom cabinetry, extensive tile, or structural changes.
Projects requiring plans or permits also need time before construction for design, documentation, and applicable approvals.
We establish the scope and major selections before construction so we’re not making important decisions after the bathroom has already been demolished.
It depends on the scope of work. Cosmetic updates may not require the same approvals, but permits may be needed when the remodel involves:
For larger bathroom renovations, Los Angeles may also require plans, permit review, and inspections. Pacific Palisades is within the Brentwood–Pacific Palisades Community Plan area, so additional property-specific requirements may apply.
Kol & Co. coordinates the applicable plans, permits, construction, and inspections for your bathroom remodel.

We look at the existing bathroom, discuss what you want to change, and define the priorities and overall scope.

We develop the layout and coordinate the shower, tub, vanity, cabinetry, fixtures, lighting, tile, stone, and other major selections.

When plans, engineering, or permits are required, we coordinate the applicable documentation and approvals.

We manage demolition, framing, plumbing, electrical, waterproofing, tile and stone, cabinetry, fixtures, shower glass, and finish work.

We complete the remaining details and review the finished bathroom with you before project handoff.
We work with homeowners throughout Pacific Palisades and surrounding West Los Angeles communities, including homes around Palisades Village, Huntington Palisades, the Alphabet Streets, Marquez Knolls, the Highlands, Rustic Canyon, Brentwood, and Santa Monica.
Whether you’re redesigning an existing primary suite, remodeling several bathrooms throughout the home, or starting fresh as part of a Pacific Palisades rebuild, we’ll approach the bathrooms as part of the home—not isolated rooms.
Kol & Co. brings design, construction experience, and project coordination together under one team, from the first layout decisions through the finished stone, cabinetry, fixtures, and final details.
Our bathroom remodeling projects typically fall around $25,000–$40,000+. Larger primary bathrooms with layout changes, custom cabinetry, premium stone and tile, specialty fixtures, and extensive plumbing work can exceed that range.
Most bathroom remodels take approximately 3–5 weeks of construction once the project is ready to begin. Larger or more complex bathrooms may require additional time.
It depends on the work. Changes involving plumbing, electrical, mechanical systems, walls, structural components, or the existing layout may require applicable permits and inspections. Property-specific requirements should also be checked before construction.
Yes. For a larger rebuild, we can coordinate bathroom design and construction as part of the overall residential project. Los Angeles County continues to maintain dedicated rebuilding resources for homeowners affected by the Palisades Fire, including permitting and rebuilding programs.
For projects requiring them, we can coordinate the applicable plans, permit process, construction, and required inspections as part of the overall scope.
Yes. Our design-build approach allows us to coordinate the layout, cabinetry, fixtures, materials, lighting, and construction rather than separating design from the way the bathroom will actually be built.